Our
Case Studies

Project Case Study:
Rural bridge repairs and bank strengthening

Project Description
Repairs and modifications to a timber bridge, building up of the embankments on both sides of the bridge.
Project Case Study:
Base preparation, retaining wall and concrete works for a leisure facility

Project Description
Earthworks, subsoil drainage, base preparation, construction of a retaining wall, 1.2m high chain-link fence with access gates ready for the installation of Tiger Turf’s NRG2 artificial playing surface.
Project Case Study:
Clyde Heritage Precinct, street upgrade

Project Description
Alpine Civil provided a full range of civil works relating to both pedestrian and vehicle traffic across the heritage precinct over two periods coinciding with quieter visitor times.
Project Case Study:
Groundworks to support the relocation of Ring Main Unit

Project Description
Relocation of a new Ring Main Unit (RMU) on a raised base, with retaining timber walls. Trenching, laying of conduits to current regulations and backfilling as required.
Project Case Study:
Groundworks to support relocation of overhead cable to underground ducts

Project Description
The removal of multiple overhead power conductor cables to become underground ducted cables, replacement of aged power poles with 10m Busk poles.
Project Case Study:
Underground services for wastewater pump station

Project Description
Alpine Civil was contracted to deliver the installation of all underground services associated with the new pump station and pump station building at Domain Rd, Lake Hawea.